Important Met Line Closures

From Monday 16 May until late 2018 the Metropolitan line will close earlier than normal between Aldgate and Wembley Park. From approximately 22:00 on Mondays, Tuesdays and Wednesdays track and drainage work will be taking place between Baker Street and Finchley Road.

From approximately 22:00 on Mondays, Tuesdays and Wednesdays track and drainage work will be taking place between Baker Street and Finchley Road.

The track and drainage is being replaced to increase reliability and shorten journey times. This section of line runs in single bore tunnels which means there is less room to work in than on other parts of the network.

To speed up the work by allowing contractors longer on site each night, the line will close early between Aldgate and Wembley Park on Mondays, Tuesdays and Wednesdays.

Travel options

A revised Metropolitan line service will operate north of Wembley Park:

  • Wembley Park to Amersham – every 30 minutes
  • Wembley Park to Chesham – every 30 minutes
  • Wembley Park to Uxbridge – every 10 minutes
  • Harrow-on-the-Hill to Watford – every 15 minutes

Use the Jubilee line for travel between Wembley Park and Baker Street.

Use the Circle or Hammersmith & City line for travel between Baker Street and Aldgate.

Chiltern Railways services also run between Amersham, Chalfont & Latimer, Chorleywood, Rickmansworth, Harrow-on-the-Hill and Marylebone.

Revised first and last train times

Last Metropolitan line through trains to central London

From To Mondays – Wednesdays
Amersham Aldgate 20:47
Chesham Baker Street 21:03
Uxbridge Aldgate 21:27
Watford Aldgate 21:13
Wembley Park Aldgate 21:54

Later trains run on all branches. After the times above, change at Wembley Park for the Jubilee line to Baker Street.

Last Metropolitan line through trains from central London

From To Mondays – Wednesdays
Aldgate Amersham 22:17
Aldgate Chesham 22:32
Aldgate Uxbridge 22:22
Baker Street Watford 22:13

Later trains run between Wembley Park and Amersham, Chesham and Uxbridge. Later trains run between Harrow-on-the-Hill and Watford.

Last Chiltern Railways services (from Monday 16 May 2016)

From To Mondays – Wednesdays
Marylebone Amersham 23:57
Amersham Marylebone 23:09

First Metropolitan line through trains from Baker Street

To Tuesdays – Thursdays
Amersham 06:31
Chesham 06:24
Uxbridge 05:58
Watford 05:53

Earlier trains on the Watford branch run from Harrow-on-the-Hill and on all other branches from Wembley Park.

First Metropolitan line through trains to central London

From To Tuesdays – Thursdays
Amersham Aldgate 05:26
Chesham Aldgate 05:56
Uxbridge Baker Street 05:12
Watford Aldgate 05:29
Wembley Park Baker Street 05:28

First Jubilee line trains (Tuesdays – Thursdays)

From Departs To Arrives
Baker Street 05:42 Wembley Park 06:01
Wembley Park 05:05 Baker Street 05:22