Gas leak repair works which will take 7 days (or maybe more) have started today and there are now temporary 3-way traffic lights on the appraoches to the Field End Road/Bridle Road roundabout. The exit side of St Lawrence Drive is also closed and the two bus stops in the vicinity have been suspended. There is severe traffic congestion as a result
3-way temporary traffic lights at the Field End Road/Bridle Road roundabout
